Here is my proposal
-We start WWTOOs at about 11am
-At Noon (or after WWTOOs) we work on a few small projects like
--prime coating the rails where the paint has come off to metal
--repainting the metal railings in forest green
(I have all the paint)
--Possibly painting the steps and non-skiding them (its easy I'll show ya)
--Cleaning the railings, stairs, and behind the rails area of the steps up to Apt B (They are a mess..and I recommend a heavy duty cleaner)
--Possibly glue some new stair treads on those steps
(I want to coordinate this activity with John so that we can do both sets of steps at the same time so we don't have 1/2 used tubes of liquid nails laying around in the basement) So it might not get done on Sunday.
If we start at noonish we and have a few folks working on this, hopefully we can wrap up by 1-1:30 and then do a workshop while everything dries.
-I "HIGHLY" recommend old clothes or something to put on while painting. I know... I have ruined many a piece of clothing thinking that --I-- wasn't going to get any paint on --me-- Yeah right
If this is acceptable, let me know and we can run with it.